le SMBP court aussi !

Mens sana in corpore sano
Une nouvelle façon de promouvoir notre laboratoire


Haut de page



À lire aussi...

The lab moved in September 2019 in a temporary building

We have moved in a new dedicated building. Our new lab is now installed in Batiment K, just to the left when entering through the main (...) 

> Lire la suite...

Our 5800 has been moved to the new building safe and sound

The move went smoothly. However, it was necessary to dismantle the TOF, which would not fit through the doors, take an elevator, and walk through (...) 

> Lire la suite...